Point Clair Road
St. Gabriel, LA 70776
Iberville Parish
30.227803, -91.114526
Total acres
Site Location
Usable acres
Kinder Morgan St. Gabriel Terminal
Point Clair is a 728 acre site located on the east bank of the Mississippi River in the Baton Rouge Metropolitan area. This site is approximately 1,600 feet from the Kinder Morgan St. Gabriel Terminal, a mile from Syngenta and right across the river from major industrial facilities, such as, Shintech, SNF Flopam and Westlake Plaquemine.
Site Specifics
ACREAGE AND LISTING PRICE
728 divisible acres
Approximately 600 usable acres due to wetlands and batture area
Zoned (R1A) Single Family Residential (should have little to no issue with rezoning in this area)
$24,660,000 or $32,500 per acre (will subdivide at a premium)
WATER FRONTAGE AND DOCK ACCESS
Approximately 3,200 feet of river frontage at northern end of site
Approximately 580 feet of river frontage at southern end of site
Approximately 1,600 feet from Kinder Morgan St. Gabriel Terminal with access to barge and deep-water vessel docks
PROCESS WATER
Unlimited process water at no cost (intake/discharge from Mississippi River)
Infrastructure cost for intake/discharge is estimated to be between $5 and $10 million
UTILITY AND SERVICE PROVIDERS
Electricity - Entergy Louisiana
WETLANDS
Approximately 75 acres of batture area (including transportation right-of-way)
Approximately 50 acres of wetlands per the National Wetlands Inventory
Terminal Infrastructure
KINDER MORGAN ST. GABRIAL TERMINAL
PRODUCT STORAGE
17 storage tanks with 334,950 barrels of storage capacity ranging from 1,500 to 80,000 barrel tanks
Bulk liquid storage (commodities handling of Chemicals, Petrochemicals and Fertilizers)
Tank truck loading, unloading and weighing
DOCKS
45’ draft ship dock for vessel loading and unloading
Barge dock for barge loading and unloading
RAIL SERVICES
Rail serviced by Canadian National Railway
Rail car loading and unloading
PIPELINES
Direct pipeline to chemical manufacturing facilities
Pipeline injecting for Ineos, BASF and Rubicon
Pipeline to Canadian National rail spur
Products are shipped and received through dedicated pipelines to each tank
Wetlands Map
PSS1A; PF01A - Freshwater forested/shrub wetland
Pipeline Map
Hydrogen
Ammonia
Carbon Dioxide
Point Clair
Location Map
Transportation Infrastructure
NAVIGABLE WATER
Mississippi River (0.3 miles)
PORTS
Port of Greater Baton Rouge (shallow) (25.9 nautical miles upstream)
Port of South Louisiana (52.5 nautical miles downstream)
Port of New Orleans (86 nautical miles downstream)
AIRPORTS
Baton Rouge Metropolitan Airport (25.6 miles)
Port of South Louisiana Executive Regional Airport (38.8 miles)
Louis Armstrong New Orleans International Airport (58.2 miles)
INTERSTATES AND HIGHWAYS
Interstate 10 (11 miles)
State Highway 141 (0 miles)
RAILROADS
Canadian National Railway (1 miles)
Pipeline Infrastructure
Carbon Dioxide (approximately 2.5 miles)
Hydrogen (less than 1 mile)
Ammonia (approximately 1 mile)
Natural Gas (ample connectivity)