Site Map

Louisiana Highway 22

Darrow, LA 70725

Ascension Parish

30.14583, -90.91066

Total acres

Usable acres

Impala Burnside Terminal

Burnside II is a 262 acre site located on the east bank of the Mississippi River in the Baton Rouge Metropolitan area. This site is adjacent to the Impala Burnside Terminal.

Site Specifics

ACREAGE AND LISTING PRICE

  • 262 divisible acres

  • Approximately 245 usable acres due to wetlands and right-of-ways

  • Zoned (HI) Heavy Industrial

  • Price per acre to be determined

WATER FRONTAGE AND DOCK ACCESS

  • Less than a mile from Mississippi River

  • Adjacent to the Impala Burnside Terminal with access to barge and deep-water vessel docks

PROCESS WATER

  • Unlimited process water at no cost (intake/discharge from Mississippi River with right-of-way access)

  • Infrastructure cost for intake/discharge is estimated to be between $5 and $10 million

UTILITY AND SERVICE PROVIDERS

  • Electricity - Entergy Louisiana

  • Fiber-Optic - Eatel and Cox

WETLANDS

  • Approximately 14 acres of wetlands per the National Wetlands Inventory

Terminal Infrastructure

IMPALA BURNSIDE TERMINAL

LOADING RATE

  • 8,000 metric tons per hour ship loader peak capacity

  • 25,000 metric tons per day guaranteed load rate

PRODUCT STORAGE

  • 600,000 metric tons contiguous storage space

MIDSTREAM OPERATIONS

  • 5 buoys with a capacity of 150 metric tons each

  • Upstream buoy is located at a distance of approximately 1,235 fee from downstream buoy

  • Maximum length overall - 230 meters / 755 feet

  • Maximum beam - 32.2 meters / 105.6 feet

  • Maximum displacement - 85,600 metric tons

  • Maximum air draft - 17 meters / 56 feet

BERTH DESCRIPTION

  • Length of berth - 335 meters / 1,100 contiguous feet

  • Length of dock - 267 meters / 875 feet

  • Water depth at dock - 14 meters / 46 feet low water draft

  • Spout reach from face of dock - 40 meters / 131 feet

OCEAN VESSEL LIMITATIONS

  • Maximum length overall - 270 meters / 886 feet

  • Maximum beam - 43 meters / 141 feet

  • Maximum displacement - 169,500 metric tons (when fully loaded)

  • Maximum air draft - 18.6 meters / 61 feet

BARGE UNLOADING LIMITATIONS

  • Maximum width - 10.7 meters / 35 feet

  • Maximum length - 62.5 meters / 205 feet

TERMINAL RESOURCE BROCHURE

TERMINAL RULES AND REGULATIONS

 

Wetlands Map

PSS1A - Freshwater forested/shrub wetland

Pipeline Map

Site Location

Hydrogen

Ammonia

Carbon Dioxide

Burnside II

Location Map

Transportation Infrastructure

NAVIGABLE WATER

  • Mississippi River (0.8 miles)

PORTS

  • Port of South Louisiana (26.5 nautical miles downstream)

  • Port of Greater Baton Rouge (shallow) (51.8 nautical miles upstream)

  • Port of New Orleans (60.7 nautical miles downstream)

AIRPORTS

  • Port of South Louisiana Executive Regional Airport (23.5 miles)

  • Baton Rouge Metropolitan Airport (36.1 miles)

  • Louis Armstrong New Orleans International Airport (41.7 miles)

INTERSTATES AND HIGHWAYS

  • Interstate 10 (2.1 miles)

  • State Highway 22 (0 miles)

RAILROADS

  • Canadian National Railway (0.3 miles)

Pipeline Infrastructure

  • Carbon Dioxide (approximately 5 miles under river)

  • Hydrogen (less than 1 miles)

  • Ammonia (approximately 7 miles)

  • Natural Gas (adjacent to site)